RPEQ-stamped. Technically rigorous. Delivered across airports, health facilities, substations, and critical infrastructure throughout Queensland and nationally.
Showing 8 projects
Project photo placeholder
Major Queensland Airport
Full LV audit of terminal distribution boards delivered alongside a validated ETAP model with arc flash study results. EcoStruxure integration scoped for ongoing condition monitoring — transitioning the client from reactive to predictive asset management.
Project photo placeholder
Major Bulk Logistics Facility
As-built audit of the full 11kV/LV distribution network, ETAP model reconciled against existing single-line drawings, and a completed digital twin delivered as the client's primary asset management tool — replacing paper-based records entirely.
Project photo placeholder
Tier III Data Centre Operator
Full UPS and PDU condition audit across two live halls, load analysis against nameplate ratings, and a prioritised replacement schedule for capital planning — delivered without disruption to live operations.
Project photo placeholder
Transmission Network Owner
Pre-construction review of the full contractor design package — access constraints identified and resolved, shutdown sequencing validated, and protection interface risk communicated before construction mobilisation.
Project photo placeholder
Metropolitan Health Facility
Design and construction delivery for a ward expansion — new MCC, HV/LV distribution upgrade, generator tie-in, and RPEQ sign-off. Coordinated across live hospital constraints with zero patient impact during critical switchovers.
Project photo placeholder
Regional Airport Operator
RPEQ design and full project delivery of apron lighting upgrade — civil/electrical interface managed, airside access coordinated through the airport's safety management system, commissioning completed under live operational constraints.
Project photo placeholder
Resources Sector Client
Empower3D engineer embedded with the client project team for the full duration of a substation upgrade — shutdown leadership, contractor technical oversight, and daily reporting. Client retained full programme visibility without carrying permanent headcount.
Project photo placeholder
Critical Infrastructure Owner
Technical scope development and full tender evaluation for a HV switchgear replacement program — specification writing, RFT support, contractor pre-qualification assessment. Client entered procurement with a defensible technical position.
Every project above started with a technical brief and an engineering conversation — not a sales call.