⚠ WIREFRAME PROTOTYPE — Projects · All imagery is placeholder · Not for distribution
Project Delivery

Work That
Holds Up
Under Scrutiny

RPEQ-stamped. Technically rigorous. Delivered across airports, health facilities, substations, and critical infrastructure throughout Queensland and nationally.

Filter by sector
Showing 8 Projects
Replace:
Airport terminal
distribution board
photography
Outcome
Full LV audit of terminal distribution boards delivered alongside a validated ETAP model with arc flash study results. EcoStruxure integration scoped for ongoing condition monitoring — transitioning the client from reactive to predictive asset management.
Discuss a Similar Project
Airports & Aviation Audits & Digital Modelling
LV Switchboard Audit & ETAP Model
Major Queensland Airport
Replace:
Industrial facility
11kV switchboard
photography
Outcome
As-built audit of the full 11kV/LV distribution network, ETAP model reconciled against existing single-line drawings, and a completed digital twin delivered as the client's primary asset management tool — replacing paper-based records entirely.
Discuss a Similar Project
Logistics & Industrial Audits & Digital Modelling
Digital Twin Build — 11kV/LV Network
Major Bulk Logistics Facility
Replace:
Data centre
UPS/PDU
photography
Outcome
Full UPS and PDU condition audit across two live halls, load analysis against nameplate ratings, Schneider/APC equipment assessment, and a prioritised replacement schedule for capital planning — delivered without disruption to live operations.
Discuss a Similar Project
Data Centres Audits & Digital Modelling
UPS & PDU Audit — Dual Hall
Tier III Data Centre Operator
Replace:
Zone substation
photography
Outcome
Pre-construction review of the full contractor design package — access constraints identified and resolved, shutdown sequencing validated, and protection interface risk communicated to the client before construction mobilisation. Saved programme time and reduced contractor RFI volume on site.
Discuss a Similar Project
Utilities & Substations Constructability Reviews
Zone Substation Constructability Review
Transmission Network Owner
Replace:
Hospital electrical
plant room
photography
Outcome
Design and construction delivery for a ward expansion — new MCC, HV/LV distribution upgrade, generator tie-in, and RPEQ sign-off on all electrical works. Coordinated across live hospital constraints with zero patient impact during critical switchovers.
Discuss a Similar Project
Hospitals & Healthcare Electrical Project Delivery
Ward Expansion — Electrical Capital Works
Metropolitan Health Facility
Replace:
Apron lighting
airside photography
Outcome
RPEQ design and full project delivery of apron lighting upgrade — civil/electrical interface managed, airside access coordinated through the airport's safety management system, commissioning completed under live operational constraints without stand disruption.
Discuss a Similar Project
Airports & Aviation Electrical Project Delivery
Apron Lighting Upgrade
Regional Airport Operator
Replace:
Site operations
electrical panel
photography
Outcome
Empower3D engineer embedded with the client project team for the full duration of a substation upgrade — shutdown leadership, contractor technical oversight, and daily reporting. Client retained full programme visibility and technical authority without carrying permanent headcount.
Discuss a Similar Project
Mining & Resources Embedded Project Support
Embedded Engineering — Substation Upgrade
Resources Sector Client
Replace:
HV switchgear
infrastructure photography
Outcome
Technical scope development and full tender evaluation for a HV switchgear replacement program — specification writing, RFT support, contractor pre-qualification assessment. Client entered procurement with a defensible technical position and a shortlist of genuinely capable contractors.
Discuss a Similar Project
Utilities & Substations Procurement & Scope Advisory
HV Switchgear Replacement — Procurement & Scope Advisory
Critical Infrastructure Owner
Next Steps
Working on
Something Similar?

Every project above started with a technical brief and an engineering conversation — not a sales call. If you're scoping an audit, a capital works programme, or a digital twin build, talk to us before you write the scope.